Civil and earthworks
Dust control and soil compaction can burn through thousands of gallons a day. Water trucks fill at the hydrant over and over, so the meter and its RPZ are the first thing set on the job and the last thing to leave.
Contractor meters · Fort Worth
Assembled. Installed. Tested. Moved.
The city won't let you run water off a hydrant meter without a tested RPZ on it. We bring the RP assembled and install it on your meter. Then we test it on site and send the report to the city. Same-day setup available.
Our RPZ setup package gets the backflow on your hydrant meter, tested and filed with the city, so your crew can start pulling water. Add hoses and you leave ready to fill.
Our package covers the RP, the install and the test, and we upload the report to the city. Give us the jobsite and when you need water, and we'll have everything set up.
Dust control and soil compaction can burn through thousands of gallons a day. Water trucks fill at the hydrant over and over, so the meter and its RPZ are the first thing set on the job and the last thing to leave.
Milling machines spray water on the cutting drum to cool the teeth and hold down dust, and crews mix and cure concrete on site. Road jobs move every day, so the meter moves too, and every move means the RPZ gets retested.
Directional boring mixes its drilling mud from hydrant water. New water and gas lines get filled and pressure-tested, and new mains get flushed before tie-in. All of that water runs through a hydrant meter.
Hydro-demolition, industrial pressure washing and sewer jetting trucks use a lot of water on sites with no tap to hook to, so they pull it from a hydrant.
Based in Fort Worth, working jobs across DFW. We handle the RP, the install, the test and the city report.
Something else? Call (817) 301-4247.
If you're pulling water from a city hydrant meter in DFW, the meter needs a tested RPZ before it goes to work. We cover the entire DFW area. Call us with your jobsite and we'll get you set up.
Often the same day. Call early with the city and the jobsite address.
The RPZ has to be tested again at the new hydrant. Call us and we'll move it and retest it.
Most jobs run a 2-inch RP. If you need more flow, we can set a 2½-inch. Not sure? Tell us the meter size and what you're filling.
We do, right after the test.
Yes. The assembly is yours. When you get your next meter, call us and we'll set it and test it there.
Fort Worth, Arlington, Mansfield, Frisco, Allen and the rest of the Dallas-Fort Worth area.
Call or send us the job details.
(817) 301-4247Mon–Fri 8am–6pm · Sat 9am–3pm